PRODUCTION SCHEDULE

Production Company                    5 Star productions

Directors & Production Crew      Malachi Davis-Barzey, Raphael Peart, Ricardo Brown & Hussain Miah


FIRST ROUGH CUT
Filming

(14/10/2010 - 01/11/2010)                 
Location 
College - Using college classrooms and staff offices to look like main characters place of work
(Date: 19/10/2010 Time: 9am-11.45am)
(Date: 20/10/2010 Time: 2pm-3pm)

Director: Malachi
Assistant Director:  Raphael
Camera Operator:  Ricardo, Hussain
Cast:  Malachi
                                                                 
Begin editing if we finish before half term.                                                                                   

Half Term

Location
Ricardo's neighbours house - for main characters home scenes.
Malachi's house - Candle lit dinner table for dinner scene with main character and girlfriend
Local Park - Scene with main character and his girlfriend
(25/10/2010 - 01/11/2010) 

Director: Malachi
Assistant Director:  Raphael
Camera Operator:  Ricardo, Hussain
Cast:  Malachi & Leandra (actress)
Editing

Main editors Malachi & Raphael
(01/11/2010 - 05/11/2010)     -                   

Short film first rough cut submitted by
(05/11/2010)
DRAFT POSTER

Concept for poster design by Raphael. To be made on Adobe by Raphael and Ricardo.
SUBMIT BY (12/11/2010)



SECOND ROUGH CUT/MAGAZINE REVIEW PAGE DRAFT


Film all corrections needed for second draft between (8/11/2010-12/11/2010)

Director: Malachi
Assistant Director:  Raphael
Camera Operator:  Ricardo, Hussain
Cast:  Malachi

Begin second edit the following week  (15/11/2010-19/11/2010)

SUBMIT BY (19/11/2010) 
MAGAZINE - Begin first draft of magazine review page by (15/11/2010)
SUBMIT BY (19/11/2010)

FINAL POSTER


Start Improvements on Poster by (22/11/2010)
SUBMIT BY (26/11/2010)

FINAL DRAFT MAGAZINE PAGE

Begin making final changes by (29/11/2010)
SUBMIT BY (3/12/2010)

FINAL CUT OF FILM

If any changes need to be made in location/acting film during week  
(22/11/2010-29/11/2010)

Make any ammendments to the edit between (30/12/2010-10/12/2010)

SUBMIT BY (10/12/2010) 